News Releases

Results:
Tag: Gavins Point Dam
Clear
  • Missouri River reservoir system prepared for 2021 runoff season

    The full flood control capacity of the Missouri River Mainstem Reservoir System is available for the 2021 runoff season. “All 2020 flood water stored in the annual flood control zone has been evacuated as of December 21,” said John Remus, chief of the U.S Army Corps of Engineers’, Missouri River Basin Water Management Division. “The entire flood control capacity of the Mainstem System is available to capture and manage 2021 runoff, reducing flood risk while providing support to the other authorized project purposes.”
  • Gavins Point Dam releases reduced to winter release rate

    The U.S. Army Corps of Engineers began reducing the Gavins Point releases to the winter release rate on Nov. 24, marking the end of flow support for the 2020 Missouri River navigation season. “Releases from Gavins Point Dam were reduced from 34,000 cubic feet per second to 17,000 cfs,” said John Remus, Chief of the Missouri River Water Management Division. “Releases from Gavins Point will be adjusted this winter as needed to lessen the impacts of river ice formation on water intakes in the lower river.” Based on the Sept. 1 System storage, Gavins Point Dam winter releases will be at least 17,000 cfs.
  • Public scoping period to begin for Gavins Point Dam, Lewis and Clark Lake master plan; virtual public meeting scheduled

    The Omaha District will be hosting a virtual public scoping meeting on Tuesday, Dec. 15. This meeting will kick off the public scoping and comment period for the update and revision of the Gavins Point Dam, Lewis and Clark Lake master plan.
  • Gavins Point Dam releases to be reduced to winter release rate in late November

    In two virtual public meetings held Nov. 2, U.S. Army Corps of Engineers’ Missouri River Water Management Division presented current hydrologic conditions and planned operation of the Missouri River mainstem reservoir system for the remainder of 2020. Public meetings are held each fall and spring to update the region on current conditions and planned operations. The Nov. 2 meetings included draft plans for operating the system during 2021.
  • Missouri River Water Management virtual public meetings set for Nov. 2

    The Missouri River Water Management Division invites the public to participate in one of two virtual public meetings scheduled for Nov. 2. The meetings will take place at 1:30 p.m. and 6 p.m. central time. Details for connecting to each webinar is posted to our website.
  • Corps updates stakeholders on Missouri River Mainstem System operations

    The US Army Corps of Engineers Missouri River Water Management Division hosted an update call on Thursday, Oct. 22, for Congressional representatives, Tribal, and state and local government officials, to include emergency managers, local levee sponsors and the media to discuss current conditions, and the projected operation of the mainstem reservoir system as part of the Draft Annual Operating Plan which was released in mid-September for public comment.