News Releases

Results:
Category: Northwestern Division, U.S. Army Corps of Engineers
Clear
  • Gavins Point releases increased slightly ahead of colder temperatures

    The U.S. Army Corps of Engineers increased Gavins Point releases from 17,000 cubic feet per second to 19,000 cfs at noon Friday. The National Weather Service’s forecast indicates the lower Missouri River basin will experience extreme cold temperatures for the next 7-10 days. The much colder temperatures have the potential to cause or exacerbate ice formation on tributaries and the mainstem of the lower Missouri River.
  • Below average runoff forecast for the upper Missouri River Basin in 2021

    **Updated to correct errors in hydropower table.** The updated 2021 calendar year runoff forecast for the Missouri River Basin above Sioux City, Iowa, continues to be below average. “Despite runoff being slightly above average in January, we expect 2021 runoff to be below average,” said John Remus, chief of the U.S. Army Corps of Engineers’, Missouri River Basin Water Management Division. “Both plains snowpack and mountain snowpack continue to lag behind seasonal averages, and soil moisture continues to be much drier-than-normal.”
  • USACE Publishes Policy Update for Inundation Maps and the National Inventory of Dams

    The U.S. Army Corps of Engineers published Engineer Circular 1110-2-6075, “Inundation Maps and Emergency Action Plans and Incident Management for Dams and Levee Systems,” in October. This update allows for the use and public dissemination of inundation maps in emergency action plans (EAP) and the National Inventory of Dams (NID), It also provides the dam safety community access to critical information about residual flood risks from USACE dams and levees.
  • U.S. Army Corps of Engineers Releases Work Plan for Fiscal 2021 Civil Works Appropriations

    The U.S. Army Corps of Engineers delivered to Congress its Fiscal Year 2021 (FY 2021) Work Plan for the Army Civil Works program on Jan. 19, 2021.
  • Gavins Point Dam releases reduced to winter release rate

    The U.S. Army Corps of Engineers began reducing the Gavins Point releases to the winter release rate on Nov. 24, marking the end of flow support for the 2020 Missouri River navigation season. “Releases from Gavins Point Dam were reduced from 34,000 cubic feet per second to 17,000 cfs,” said John Remus, Chief of the Missouri River Water Management Division. “Releases from Gavins Point will be adjusted this winter as needed to lessen the impacts of river ice formation on water intakes in the lower river.” Based on the Sept. 1 System storage, Gavins Point Dam winter releases will be at least 17,000 cfs.
  • Army Corps of Engineers rescinds guidance letter on easements to support water supply storage agreements

    The U.S. Army Corps of Engineers on Thursday rescinded Real Estate Policy Guidance Letter No. 26: Easements to Support Water Supply Storage Agreements and Surplus Water Agreements, dated 10 June 2008.