Garrison Dam Spillway Operations
The regulating tunnels at Garrison Dam will close on Monday, August 6 to allow project crews to perform inspections after making higher than average releases for much of July. Once the regulating tunnels are closed, releases of about 9,000 cfs will be transferred to the spillway.

Download Image: Full Size (1.46 MB)
Tags:
Photo by: Eileen L. Williamson |  VIRIN: 180716-A-RO090-001.JPG