News Releases

Results:
Tag: navigation
Clear
  • Gavins Point Dam releases reduced to winter release rate

    The U.S. Army Corps of Engineers began reducing the Gavins Point releases to the winter release rate on Nov. 24, marking the end of flow support for the 2020 Missouri River navigation season. “Releases from Gavins Point Dam were reduced from 34,000 cubic feet per second to 17,000 cfs,” said John Remus, Chief of the Missouri River Water Management Division. “Releases from Gavins Point will be adjusted this winter as needed to lessen the impacts of river ice formation on water intakes in the lower river.” Based on the Sept. 1 System storage, Gavins Point Dam winter releases will be at least 17,000 cfs.
  • Corps replaces king piles, part of the “unsung heroes” of navigation

    A $2.1 million U.S. Army Corps of Engineers project to replace missing king piles, some of which have been in place since 1885. The project is part of a greater effort to repair pile dikes. In total, 68 new king pile markers sporadically from Puget Island (river mile 41) to Multnomah Falls (river mile 136) will go in.
  • Gavins Point Dam releases to be reduced to winter release rate in late November

    In two virtual public meetings held Nov. 2, U.S. Army Corps of Engineers’ Missouri River Water Management Division presented current hydrologic conditions and planned operation of the Missouri River mainstem reservoir system for the remainder of 2020. Public meetings are held each fall and spring to update the region on current conditions and planned operations. The Nov. 2 meetings included draft plans for operating the system during 2021.
  • Missouri River Water Management virtual public meetings set for Nov. 2

    The Missouri River Water Management Division invites the public to participate in one of two virtual public meetings scheduled for Nov. 2. The meetings will take place at 1:30 p.m. and 6 p.m. central time. Details for connecting to each webinar is posted to our website.
  • Corps updates stakeholders on Missouri River Mainstem System operations

    The US Army Corps of Engineers Missouri River Water Management Division hosted an update call on Thursday, Oct. 22, for Congressional representatives, Tribal, and state and local government officials, to include emergency managers, local levee sponsors and the media to discuss current conditions, and the projected operation of the mainstem reservoir system as part of the Draft Annual Operating Plan which was released in mid-September for public comment.
  • Below average runoff continues in the upper Missouri River basin

    September precipitation was well-below normal in the Missouri River Basin.  As a result, September runoff in the upper Missouri River Basin above Sioux City, Iowa was 69% of average.  Since January 1, precipitation in the upper Basin is well-below normal.  The National Weather Service’s Climate Prediction Center (CPC) is forecasting that below-normal precipitation will continue in October.  The 2020 calendar year runoff forecast for the upper Basin, updated on October 1, is 30.2 million acre-feet (MAF), 117% of average. Average annual runoff for the upper Basin is 25.8 MAF.