News Releases

Results:
Tag: public meetings
Clear
  • Missouri River water management public meeting presentations available online

    The U.S. Army Corps of Engineers’ Missouri River Water Management Division has released four videos of presentations that would normally be given at public meetings held throughout the Missouri River Basin. In-person public meetings on Missouri River Mainstem Reservoir System operations originally scheduled for April were canceled to further reduce potential exposure to COVID-19. Instead, the agency will host virtual question and answer sessions in late April. A web page with the videos, a form for submitting questions, and call in dates and times is located here: https://go.usa.gov/xvBpc.
  • Gavins Point winter releases determined; Corps to hold public meetings in mid-October

    Based on the September 1 System storage check, the U.S. Army Corps of Engineers (Corps) announced that the Gavins Point winter release rate will be at least 17,000 cfs. The total volume of water stored in the Mainstem Reservoir System is currently 60.2 MAF, occupying 4.1 MAF of the 16.3 MAF combined flood control storage zones. “System storage peaked on July 9 at 61.8 MAF and is gradually declining. The water currently stored in the annual flood control zone will be released during the remainder of the year to serve navigation, water supply and other downstream purposes and will be completely evacuated prior to the start of next year’s runoff season,” said John Remus, chief of the Corps’ Missouri River Basin Water Management Division. Garrison releases will be reduced from the current release rate of 30,000 cubic feet per second (cfs) to the fall rate of 20,000 cfs beginning September 10. Missouri River stages in the Bismarck area will decline about 3.0 feet due to the release reduction from Garrison.