Gavins Point Dam releases reduced to winter release rate
The U.S. Army Corps of Engineers began reducing the Gavins Point releases to the winter release rate on November 23 with the navigation flow support season ending on December 1 at St. Louis, Missouri.

Download Image: Full Size (1.36 MB)
Tags:
Photo by: Paco Hamm |  VIRIN: 231205-A-RO090-001.JPG