Levee Breach 575B closed 7/25
The breach of levee 575-B-I was closed this afternoon. This closure stops the inflows through this breach and will allow for follow-on construction activities to increase the level of flood risk management to approximately the 4% annual chance exceedance (25-yr) level for this section of the L-575 levee system until the system can be fully rehabilitated.

Download Image: Full Size (0.86 MB)
Photo by: Omaha District |  VIRIN: 190725-A-A1408-001.JPG