Garrison Dam Spillway Operations
On August 6, crews at Garrison Dam will partially open 9 of the 28 spillway gates to release water at a rate of about 9,000 cfs. Before opening the spillway gates, crews will close the regulating tunnels. This will allow for an inspection of the regulating tunnels and a test of the spillway repairs made following the flooding in 2011.

Download Image: Full Size (0.68 MB)
Tags:
Photo by: Eileen L. Williamson |  VIRIN: 180716-A-RO090-002.JPG