News Releases

Results:
Tag: electricity
Clear
  • Frigid temps increase power demand while Army dams balance needs

    With frigid temperatures and near record-setting snow accumulation in some areas of the Pacific Northwest, Army dams responded by producing power to keep the lights and heat on. The U.S. Army Corps of Engineers has 21 dams in the Columbia and Willamette river basins that ramp up power production to keep the grid stable during high demands.
  • Corps decreases runoff forecast due to lower than normal mountain snowpack

    The U.S. Army Corps of Engineers Missouri River Basin Water Management Division is decreasing the annual runoff forecast for the Missouri River Basin above Sioux City, Iowa, to 20.3 million acre feet (MAF), which is 80 percent of normal and 4.9 MAF less than average. The decreased forecast is due to below normal mountain snowpack and the lack of plains snow in the basin.
  • February runoff higher, but 2015 Missouri River forecast still slightly below normal

    The U.S. Army Corps of Engineers Missouri River Basin Water Management Division reports runoff in the Missouri River Basin above Sioux City, Iowa was 2 million acre feet (MAF) during February, 186 percent of normal. The increased runoff was caused by above normal temperatures in the upper Missouri Basin that limited river ice build-up, and melted both plains and low elevation mountain snows. However, the 2015 runoff forecast in the same reach is 24.6 MAF, 97 percent of normal, and the March runoff forecast is about 1 MAF less than in February.
  • Reservoir system prepared for 2015 runoff season; previously stored flood waters evacuated

    Monthly Missouri River Water Management Report for February 2015. Updates on weather conditions, snow pack, reservoir levels and release forecast.
  • Corps increases releases due to cold temperatures; normal runoff forecast for 2015

    The U.S Army Corps of Engineers Missouri River Water Management Office increased releases from Gavins Point Dam from 17,000 to 20,000 cubic feet per second in late December and early January to offset water lost to ice formation in response to forecasts of cold temperatures.
  • Corps reduces Missouri River dam releases to winter levels

    As part of the normal operation of the Mainstem Reservoir System, the U.S. Army Corps of Engineers Missouri River Basin Water Management Division has reduced releases from several Missouri River dams to winter levels.