News Releases

Upper basin runoff forecast improves, remains below average; Fort Peck test flows to begin in late April

Missouri River Basin Water Management
Published April 8, 2024
A map of the Missouri River Basin with pins dropped for the mainstem dams and the locations for navigation flow targets. A gray box shows the times for the Lower Missouri River Basin public meetings on APRIL 16 at Smithville, MO Start time: 11 p.m. Central Time Jerry Litton Visitor Center 16311 DD Hwy Smithville, MO 64089 and Bellevue, NE Start time: 4  p.m. Central Time Bellevue University; Hitchcock Humanities Building, 1040 Bruin Blvd, Criss Auditorium, Bellevue, NE 68005 In a light gray box on the right the system storage check dates are noted. System Storage Checks:
March and July system storage checks help determine the level of flow support for navigation and other downstream purposes as well as the navigation season length.
March 15 - used to set service level for first half of the navigation season.
July 1 - used to set service level for second half of navigation season and set season service length.
September 1 - used to set the winter System release rate.

APRIL 16 Smithville, MO Start time: 11 p.m. Central Time Jerry Litton Visitor Center 16311 DD Hwy Smithville, MO 64089 Bellevue, NE Start time: 4 p.m. Central Time Bellevue University; Hitchcock Humanities Building, 1040 Bruin Blvd, Criss Auditorium, Bellevue, NE 68005

A map showing the Upper Missouri River Basin with pins denoting the locations of each Missouri River Mainstem Dam operated by the U.S. Army Corps of Engineers Northwestern Division. Text on the image provides a schedule for weekly calls to be held through the duration of the test flows. 
Calls will be held cach Wednesday from April 24-July 17, 2024 at 1:00 PM Central Time. Weekly calls will be held through the duration of the Fort Peck Test Flows. 
The calls will provide a report on: current releases, the previous week’s release rates, and operations for the 
next week through the course of the test. The website for accessing the calls is https://usace1.webex.com/usace1/j.php?MTID=ma8b176ff7ce553ae5f1f645f3a8629a4

The link only works during an active call. For recordings of the call, users can visit www.nwd.usace.army.mil/MRWM/MRWM-News/

Updates on the Fort Peck Test Flow will be held each Wednesday from April 24-July 17, 2024 at 1 p.m. Central Time. Weekly calls will be held through the duration of the Fort Peck Test Flows. Calls will report on: Current releases, Previous week’s release rates, and Operations for the next week through the course of the test. Calls can be accessed at: https://usace1.webex.com/usace1/j.php?MTID=ma8b176ff7ce553ae5f1f645f3a8629a4 Please note the link only works during active calls.

Two tables the first showing Missouri River Mainstem Reservoir Data with the Pool Elevation at the end of the month and how much the elevation has changed during the month and how much water is in storage at the end of the month compared to the average and how much the amount of water in storage has changed in for the month. 

The second table shows water releases and energy generation in May at each reservoir. There are three columns of data Average releases in 1000 cubic feet per second, volume of releases in acre feet, and how much power was generated from releases at each project. The data is provided in the photo caption.

MISSOURI RIVER MAINSTEM RESERVOIR DATA Pool Elevation (feet above mean sea level) On March 31 Change in March On March 31 Water in Storage (1,000 acre-feet) % of 1967-2023 Average Change in March Fort Peck 2231.2 +0.8 14,201 98 +166 Garrison 1835.3 +0.2 17,079 96 +49 Oahe 1603.5 -0.1 17,426 98 -60 Big Bend 1421.1 +0.5 1,693 99 +27 Fort Randall 1352.9 +0.8 3,228 97 +64 Gavins Point 1206.7 +0.1 344 88 +4 Total 53,971 98 +250 WATER RELEASES AND ENERGY GENERATION FOR MARCH Average Release in 1,000 cfs Releases in 1,000 acre-feet Generation in Million kWh Fort Peck 5.0 309 44 Garrison 16.0 982 149 Oahe 20.3 1,248 188 Big Bend 20.0 1,228 67 Fort Randall 19.2 1,178 124 Gavins Point 20.8 1,281 53 Total 625

The latest 2024 calendar year runoff forecast for the Missouri River Basin above Sioux City, Iowa shows slight improvement.   

“The overall lack of snowpack in both the plains and the mountains has led to a below average runoff forecast for the Missouri River Basin,” said John Remus, chief of the U.S. Army Corps of Engineers’, Missouri River Basin Water Management Division. “The soil is dry across much of the basin with over 60% of the basin experiencing drought.”

The 2024 calendar year runoff forecast above Sioux City is 17.5 million acre-feet (MAF), 68% of average. The runoff forecast is based on current soil moisture conditions, mountain snowpack, and long-term precipitation and temperature outlooks. March runoff in the Missouri River Basin above Sioux City was 1.8 MAF, 59% of average.

“While the forecast remains below average, the basin has shown some improvement in runoff conditions since

the March forecast. Given reach runoff and basin conditions, we expect runoff in April to remain below normal for all reaches, but this will depend on precipitation and temperatures,” said Remus.  The March forecast was 17.0 MAF.

“Even with the lower than average runoff forecast the hydrologic conditions are sufficient to conduct a flow test from Fort Peck Dam” said Remus.  “The flow test is a requirement of the 2018 Biological Opinion and is meant to determine if there is a Fort Peck Dam water management scenario that could benefit the Pallid Sturgeon.”

System storage is currently 54.0 MAF, 2.1 MAF below the top of the carryover multiple use zone. 

Basin and river conditions continue to be monitored, including plains and mountain snow accumulation and melting, and System regulation will be adjusted based on the most up-to-date information.

Navigation:

Beginning in mid-March, releases from Gavins Point Dam were adjusted to provide flow support for Missouri River navigation. Navigation flow support for the Missouri River is at 500 cfs below full service for the first half of the 2024 season, which began April 1 at the mouth of the river near St. Louis, Missouri. The service level was based on the total volume of water stored within the System on March 15, which was 54.1 MAF, in accordance with the guidelines in the Master Manual. Flow support for the second half of the navigation season, as well as navigation season length, will be based on System storage on July 1.

Mountain and Plains Snowpack:

Mountain snowpack in the upper Missouri River Basin has remained low throughout the 2023-2024 winter and spring seasons. The April 1 mountain snowpack in the Fort Peck reach was 74% of average, while the mountain snowpack in the Fort Peck to Garrison reach was 84% of average. The Fort Peck reach is close to the minimum observed mountain snowpack over the past 30 year-period of 1991 to 2020. The Garrison reach is slightly above the minimum observed mountain snowpack. By April 1, about 95% of the total mountain snowfall has typically accumulated. Mountain snow normally peaks near April 17. The mountain snowpack graphics can be viewed at: http://go.usa.gov/xARQC.  

Fort Peck Flow Test:

Test releases from Fort Peck to assess the potential benefits of alternative management scenarios for the pallid sturgeon will begin on April 26.  The test includes two higher Fort Peck release periods, in late April and June, with target flows at Wolf Point, Montana.  The Fort Peck releases will be adjusted depending on the runoff and reach conditions downstream of Fort Peck during this period. The test will likely require spillway releases from Fort Peck.  The test releases will not affect river stages below Gavins Point Dam.  The flow test has been extensively coordinated with local stakeholders and was discussed in depth a public meeting held in Poplar, Montana on March 28, 2024.  The U.S. Army Corps of Engineers will host weekly virtual meetings during the flow test to update the public on test progress and planned operations.  Information on accessing the public meetings can be found at https://www.nwd.usace.army.mil/MRWM/Public-Meetings/.     

During the flow test a number of monitoring activities will be conducted to include fish monitoring, lidar and aerial photography, physical surveys, cultural resource surveys, and water quality sampling.  Interested parties can also provide information through a web-based application that can be found at https://hydroviz.ca/fort-peck-feedback.

Monthly Water Management Conference Calls for 2024:

The next monthly conference call will be held Wednesday, April 10, to inform basin stakeholders of current weather and runoff forecasts and the planned operation of the reservoir system in the coming months. Presentation materials will be available via webinar. The call is intended for Congressional delegations; Tribes; state, county and local government officials; and the media. It will be recorded in its entirety and made available to the public on our website at https://go.usa.gov/xARQv.

Spring Public Meetings:

The Northwestern Division, Missouri River Basin Water Management Division held a series of public meetings in the upper basin the week of March 25. Meetings for the lower basin are scheduled to be held on April 16 in both Smithville, Missouri and Bellevue, Nebraska.  The meeting times and venues are as follows:

Smithville

Start time: 11 a.m. CT
Jerry Litton Visitor Center
16311 DD Hwy
Smithville, MO 64089

Bellevue

Start time: 1600 CT
Bellevue University
Hitchcock Humanities Building,
1040 Bruin Blvd, Criss Auditorium
Bellevue, NE 68005

Reservoir Forecasts:

  • Gavins Point Dam
    • Average releases past month – 20,800 cfs
    • Current release rate – 30,000 cfs
    • Forecast release rate –32,000 cfs
    • End-of-March reservoir level –1206.7 feet
    • Forecast end-of-April reservoir level –1206.0 feet
       
  • Fort Randall Dam
    • Average releases past month – 19,200 cfs
    • Forecast average release rate – 28,800 cfs
    • End-of-March reservoir level – 1352.9 feet
    • Forecast end-of-April reservoir level – 1355.0 feet
       
  • Big Bend Dam
    • Average releases past month – 20,000 cfs
    • Forecast average release rate – 30,500 cfs
    • Forecast reservoir level – 1420.8 feet
       
  • Oahe Dam
    • Average releases past month –20,300 cfs
    • Forecast average release rate – 30,300 cfs
    • End-of-March reservoir level – 1603.5 feet
    • Forecast end-of-April reservoir level – 1600.8 feet
       
  • Garrison Dam
    • Average releases past month –16,000 cfs
    • Current release rate –16,000 cfs
    • Forecast average release rate –16,000 cfs
    • End-of-March reservoir level – 1835.3 feet
    • Forecast end-of-April reservoir level – 1834.8 feet
       
  • Fort Peck Dam
    • Average releases past month – 5,000 cfs
    • Current release rate – 5,000 cfs
    • Forecast average release rate – 6,400 cfs
    • End-of-March reservoir level – 2231.2 feet
    • Forecast end-of-April reservoir level – 2231.5 feet
    • Notes: Releases will be stepped up in late April as part of the test flows.

The forecast reservoir releases and elevations discussed above are not definitive. Additional precipitation, lack of precipitation or other circumstances could cause adjustments to the reservoir release rates.

Hydropower:

The six mainstem power plants generated 625 million kWh of electricity in March. Typical energy generation for March is 636 million kWh. Forecast generation for 2024 is 8.5 billion kWh compared to the long-term average of 9.4 billion kWh.

To view the detailed three-week release forecast for the mainstem dams, go to

http://go.usa.gov/xVgWr.

 

MISSOURI RIVER MAINSTEM RESERVOIR DATA

 

Pool Elevation
(feet above mean sea level)

Water in Storage
(1,000 acre-feet)

 

On March 31

Change in March

On March 31

% of 1967-2023 Average

Change in March

Fort Peck

2231.2

+0.8

14,201

98

+166

Garrison

1835.3

+0.2

17,079

96

+49

Oahe

1603.5

-0.1

17,426

98

-60

Big Bend

1421.1

+0.5

1,693

99

+27

Fort Randall

1352.9

+0.8

3,228

97

+64

Gavins Point

1206.7

+0.1

344

88

+4

 

 

Total

53,971

98

+250

 

WATER RELEASES AND ENERGY GENERATION FOR MARCH

 

Average Release in 1,000 cfs

Releases in 1,000 acre-feet

Generation in Million kWh

Fort Peck

5.0

309

44

Garrison

16.0

982

149

Oahe

20.3

1,248

188

Big Bend

20.0

1,228

67

Fort Randall

19.2

1,178

124

Gavins Point

20.8

1,281

53

 

 

Total

625

 


Contact
Eileen Williamson
402-996-3802
eileen.l.williamson@usace.army.mil

Release no. 24-008