US Army Corps of Engineers
Northwestern Division Website

Winter doesn't put freeze on flood repairs
Flood fighting efforts are taken Sept. 22 to protect completed repair efforts from rising high water along the L-575 Missouri River Levee System where initial breach repairs were being made.

Download Image: Full Size (0.45 MB)
Tags:
Photo by: Courtesy photo |  VIRIN: 191227-A-I1408-003.JPG