WALLA WALLA DISTRICT:
|
Anticipated
NAICS
|
Project
Location
|
Project Title
|
Fiscal
Year
|
Estimated
Dollar Value
|
Acquisition Plan
(Set Aside)
|
238210
237990
|
McNary Dam, OR
|
Isophase, HV Bus & Switch Upgrades
Headgate System Rehab. - Intake Gates
|
Q1 22
|
$25M to $100M
|
OTSB
|
237990
|
McNary Dam, OR
|
Spillway Gate Rehabilitation
|
Q1 22
|
$25M to $100M
|
TBD
|
237990
|
Lower Granite Dam, WA
|
LLA - JFF PDS Access Ramp and Bench
|
Q1 22
|
$500K to $1.0M
|
SB
|
238210
|
Lower Monumental Dam, WA
|
DC System & Low Voltage Switchgear Upgrade (Replacement)
|
Q2 22
|
$10M to $25M
|
SB
|
237990
|
Walla Walla, WA
|
Design-Build MATOC
|
Q2 22
|
TBD
|
SB
|
TBD
|
Ice Harbor Dam, WA
|
EIM Generator Metering Additions
|
Q2 22
|
$500K to $1.0M
|
TBD
|
237990
|
Ice Harbor Dam, WA
|
Life Safety Fire Alarm System Upgrade
|
Q2 22
|
TBD
|
TBD
|
238910
|
Northwestern Division
|
Regional Hazardous Waste and Abatement MATOC
|
Q2 22
|
NA
|
SB
|
237990
|
Lower Granite Dam, WA
|
MU 3-6 Turbine Blade Seal Replacement
|
Q2 22
|
NA
|
TBD
|
237990
|
Lower Granite Dam, WA
|
Unit 2 Blade Sleeve Upgrade
|
Q2 22
|
$1.0M to $5.0M
|
TBD
|
541620
|
Walla Walla, WA
|
Environmental Consulting
|
Q3 22
|
NA
|
8(a)
|
541330
|
Walla Walla, WA
|
A&E Geological & Geotechnical
|
Q3 22
|
NA
|
OTSB
|
541330
|
Walla Walla, WA
|
A&E Multi Discipline - Unrestricted
|
Q3 22
|
NA
|
OTSB
|
541330
|
Walla Walla, WA
|
A&E Structural and Mechanical
|
Q3 22
|
NA
|
OTSB
|
237990
|
Dworshak Dam, ID
|
Steelhead Smolt Release Pipe Repairs
|
Q3 22
|
$1.0M to $5.0M
|
TBD
|
332312
|
McNary Dam, OR
|
Trash Rack Fabrication (DLA Supply IDIQ)
|
Q3 22
|
NA
|
SB
|
238210
|
Little Goose Dam, WA
|
DC System & Low Voltage Switchgear Upgrade (Replacement)
|
Q3 22
|
$10M to $25M
|
TBD
|
541330
|
Walla Walla, WA
|
A&E Cost Engineering - Small Business Set Aside
|
Q3 22
|
NA
|
SB
|
541330
|
Walla Walla, WA
|
A&E Cost Engineering - Unrestricted
|
Q3 22
|
NA
|
OTSB
|
541330
|
Walla Walla, WA
|
A&E Multi Discipline - Small Business Set Aside
|
Q3 22
|
NA
|
SB
|
237990
|
Lower Granite Dam, WA
|
Upstream Floating Guidewall Improvements
|
Q3 22
|
$1.0M to $5.0M
|
SB
|
237990
|
Little Goose Dam, WA
|
Life Safety Fire Alarm System Upgrade
|
Q3 22
|
TBD
|
TBD
|
238210
|
Lower Monumental Dam, WA
|
Navigation Lock Electrical Power System & Controls Replacement
|
Q3 22
|
$5.0M to $10.0M
|
TBD
|
238210
|
Lower Granite Dam, WA
|
Nav Lock Switchgear Replacement (Supply)
|
Q3 22
|
NA
|
TBD
|
238210
|
Lower Granite Dam, WA
|
GSU T1-T2 Transformer Gasket Replacement and Oil Conditioning
|
Q3 22
|
TBD
|
TBD
|
238210
|
McNary Dam, OR
|
Navigation Lock Electrical Power System & Controls Upgrade
|
Q3 22
|
$10M to $25M
|
TBD
|
237990
|
Nation-Wide
|
National Generator Rehabilitation
|
Q4 22
|
$25M to $100M
|
TBD
|
238290
|
Lower Monumental Dam, WA
|
Powerhouse Bridge Crane Wheel and Drive System Upgrade
|
Q4 22
|
$1.0M to $5.0M
|
OTSB
|
237990
|
McNary Dam, OR
|
Drainage, Unwatering & Equalization Systems
|
Q4 22
|
$10M to $25M
|
TBD
|
237990
|
Ice Harbor Dam, WA
|
HLD Replace Fish Ladder Weir Gates / Hoists
|
Q4 22
|
$1.0M to $5.0M
|
TBD
|
237990
|
Little Goose Dam, WA
Lower Granite Dam, WA
Lower Monumental Dam, WA
|
LGA & LLA Tainter Valves System Upgrade (Navigation Lock)
LMA Navigation Lock Tainter Valves
|
Q4 22
|
$10M to $25M
|
TBD
|
237990
|
Lower Monumental Dam, WA
|
Tailrace Stop Logs
|
Q4 22
|
TBD
|
TBD
|
236210
|
Lucky Peak Dam, ID
|
Office Building
|
Q4 22
|
TBD
|
TBD
|
237990
|
Lower Granite Dam, WA
|
Levee System Drainage Lines Repairs (Lindsay Creek & 380 Drainage Lines)
|
Q1 23
|
$1.0M to $5.0M
|
SB
|
237990
|
Ice Harbor Dam, WA
|
Intake Gate Hydraulic System Upgrades
|
Q2 23
|
$5.0M to $10.0M
|
TBD
|
237990
|
McNary Dam, OR
|
Levee Drainage Pump Station Upgrades
|
Q2 23
|
$10M to $25M
|
TBD
|
237990
|
Mill Creek, WA
|
Diversion Dam Fish Ladder
|
Q3 23
|
$5.0M to $10.0M
|
SB
|
238210
|
Ice Harbor Dam, WA
|
Powerhouse Annuciation and Controls
|
Q4 23
|
$5.0M to $10.0M
|
TBD
|
238210
|
Little Goose Dam, WA
|
Powerhouse Annuciation and Controls
|
Q4 23
|
$5.0M to $10.0M
|
TBD
|
238210
|
Lower Granite Dam, WA
|
Powerhouse Annuciation and Controls
|
Q4 23
|
$5.0M to $10.0M
|
TBD
|
238210
|
Lower Monumental Dam, WA
|
Powerhouse Annuciation and Controls
|
Q4 23
|
$5.0M to $10.0M
|
TBD
|
237990
|
Lower Granite Dam, WA
|
Life Safety Fire Alarm System Upgrade
|
Q4 23
|
TBD
|
TBD
|
237990
|
Lower Monumental Dam, WA
|
Life Safety Fire Alarm System Upgrade
|
Q4 23
|
TBD
|
TBD
|
237990
|
Lower Snake River
|
Lower Snake River Intake Gate Hydraulic System Upgrades
|
Q4 22
|
TBD
|
TBD
|
237990
|
McNary Dam, OR
|
Lamprey Passage Improvements
|
Q4 22
|
TBD
|
TBD
|
237990
|
McNary Dam, OR
|
Navlock Wall Armor and Concrete Repair
|
Q4 22
|
TBD
|
TBD
|
237990
|
Dworshak Dam, ID
|
Spillway Gate Repairs
|
Q4 23
|
$1.0M to $5.0M
|
TBD
|