SEATTLE DISTRICT:
|
Anticipated
NAICS
|
Project
Location
|
Project Title
|
Fiscal
Year
|
Estimated
Dollar Value
|
Acquisition Plan
(Set Aside)
|
237990
|
Chief Joseph Dam, WA
|
Generator Rewinds - Generator refurbishment, replacing stator windings, evaluation and possible refurbishment of the field windings, evaluation and possible replacement of the stator cores, and evaluation and refurbishment or replacement of the generator brake system, high pressure lift system, the thrust bearing coolers, and installation of machine condition monitoring systems on the units.
|
Q4 FY21
|
$100M - $250M
|
Unrestricted
|
541330
|
Seattle District AOR
|
Civil Works - Architech-Engineering Service - Single-Award Task Order Contract (SATOC)
|
TBD FY22
|
$10M
|
Small Business
|
541330
|
Seattle District AOR
|
Civil Works - Architech-Engineering Service - Single-Award Task Order Contract (SATOC)
|
TBD FY22
|
$10M
|
Large Business
|
236220
|
American Lake - Tacoma, WA
|
Veterans Affairs American Lake Seismic Corrections, Phase 2a - Site Development including demolition & hazmat abatement of 5 buildings, construction grading, pavements, utilities, lighting, & landscaping for a 650 vehicle parking lot & 1000 feet of 2-lane roadway.
|
Q1 FY22
|
$10M - $25M
|
TBD
|
236220
|
Lake Washington Ship Canal, WA
|
Large Lock Center Gate LWSC
|
Q2 FY22
|
$10M - $25M
|
TBD
|
237990
|
Skokomish River Mason County, WA
|
Skokomish River Environmental Restoration Construction [ON HOLD]
CG Skokomish Rvr. Env. Restoration includes: levee removal, side channel reconnection, large woody debris placement, & wetland restoration at 2 sites
|
Q4 FY21
|
$10M - $25M
|
Small Business
|
236220
|
Corvallis, OR
|
Agricultural Research Service (ARS)/Oregon State University (OSU) Research Lab - Design / Construct 19,950 GSF Greenhouse (GH) Facility (replace 17,850 GSF screenhouse (SH)) & modernize 4 GH/SH 11,952 GSF each
|
TBD FY22
|
$10M - $25M
|
TBD
|
236220
|
Joint Base Lewis-McChord (JBLM), WA
|
Tactical Equipment Maintenance Facility
|
TBD FY22
|
$10M - $25M
|
TBD
|
237990
|
Wilapa Bay, WA
|
Maintenance Dredging
|
Q3 FY22
|
$1M - $5M
|
TBD
|
237990
|
Everett, WA
|
Clamshell Dredging
|
Q3 FY22
|
$1M - $5M
|
TBD
|
237990
|
Quillayute, WA
|
Maintenance Dredging
|
Q3 FY22
|
$1M - $5M
|
TBD
|
TBD
|
Chief Joseph Dam, WA
|
Spillway Sump Pumps and Controls BPA LCAP
Replace spillway sump pumps & controls.
|
TBD FY22
|
$1M - $5M
|
TBD
|
TBD
|
Albeni Falls Dam, ID
|
Spillway Gates and Hydraulic Steel Structure (HSS) Repair - Remove and recoat spillway gates. Repair HSS welds.
|
TBD FY22
|
$1M - $5M
|
TBD
|
TBD
|
Chief Joseph Dam, WA
|
Passenger Freight Elevator - Replace 5-floor electric (no cap, change) and 2-floor hydraulic elevators (inc. cap to 10K lbs). All to code."
|
TBD FY22
|
$1M - $5M
|
TBD
|
TBD
|
Grays Harbor, WA
|
North Jetty Repair
|
TBD FY22
|
$1M - $5M
|
TBD
|
236220
|
Pullman, WA
|
Agricultural Research Service / Washington State University Plant Biosciences Building
Construct new ~113K GSF Plant Biosciences Research Building (PBRB) for joint research. Including laboratory and office space for scientists.
|
Q1 FY22
|
$25M - $100M
|
TBD
|
236220
|
Fairchild AFB, WA
|
TFI Flight Base Operation Facility
Consolidate functional elements of active duty operations squadron, aircraft light equipment & air national guard, air refueling squadron group
|
Q3 FY22
|
$25M - $100M
|
Unrestricted
|
236220
|
Mountain Home AFB, ID
|
Water Treatment Facility
Operation and maintenance (O&M) of temporary ion exchange system on drinking water Well #4
|
Q4 FY22
|
$25M - $100M
|
TBD
|
236220
|
Joint Base Lewis-McChord (JBLM), WA
|
Unaccompanied Enlisted Personnel Housing (Barracks)
|
Q4 FY22
|
$25M - $100M
|
TBD
|
236220
|
Keyport, WA
|
NUWC B-82 Windows
Replace, 2 or 4 sides, + exterior finish-weather seal
|
Q2 FY22
|
$500K - $1M
|
TBD
|
TBD
|
Chief Joseph Dam, WA
|
480V Stn Pwr SU1-SU4 + SQ4&SQ5 SU17-SU27
Replace low-voltage station service equipment & address arc flash and reliability to keep personnel safe & station power operational with minimal downtime. Centralize 480V system monitoring & control system.
|
Q1 FY22
|
$5M - $10M
|
TBD
|
TBD
|
Chief Joseph Dam, WA
|
Station Service - Primary Component
Rehabilite station service units.
|
Q1 FY22
|
$5M - $10M
|
TBD
|
TBD
|
Lake Washington Ship Cannal, WA
|
Sediment Characterization
|
Q2 FY22
|
Not Applicable
|
TBD
|
TBD
|
Chief Joseph Dam, WA
|
480V Stn Pwr SU1-SU4 HMI/PLC Equipment
Supply Contract purchase HMI/PLC equipment so HDC can program it for the project before it is needed during construction.
|
Q4 FY22
|
Not Applicable
|
TBD
|
TBD
|
Albeni Falls Dam, ID
|
Work Boat for Natural Resources Management
Purchase - One 24 Landing Craft Munson 24 PackCat or equivalent
|
Q4 FY22
|
Not Applicable
|
TBD
|
238910
|
Greenwater
|
Levee Rehab
|
Q2 FY22
|
TBD
|
TBD
|
236220
|
American Lake - Tacoma, WA
|
Veterans Affairs American Lake Seismic Corrections, Phase 2b - Construct Bldg. 201 (76,125 GSF) outpatient medical facility, parking & traffic improvements
|
Q4 FY22
|
TBD
|
TBD
|
TBD
|
Wyckoff, WA
|
Wyckoff Wall Construction - Design & procure replacement for existing steel sheet pile wall
|
Q2 FY22
|
TBD
|
TBD
|
238910
|
St. Regis
|
Levee Rehab
|
Q2 FY22
|
TBD
|
TBD
|
TBD
|
Albeni Falls Dam, ID
|
Fish Passage Facility
Advance & finalize design for a fish passage facility at Albeni Falls Dam in Oldtown, ID
|
Q4 FY23
|
TBD
|
TBD
|
TBD
|
Wyckoff, WA
|
Debris Removal
|
TBD FY22
|
TBD
|
TBD
|