336611
|
TBD
|
Essayons Maintenance & Repair Contract
|
Q3 22
|
$5M-$10M
|
Unrestricted
|
336611
|
TBD
|
Yaquina Maintenance & Repair Contract
|
Q3 22
|
$5M-$10M
|
Unrestricted
|
333923
|
Bonneville
|
PH2 65-Ton Tailrace Gantry Crane Replacement
|
Q1 22
|
|
SB
|
332312
|
Bonneville
|
Bonneville PH 1 Trash Rack SATOC
|
Q3 22
|
$7.5M
|
SB
|
332312
|
John Day
|
John Day Trashracks SATOC
|
Q3 22
|
$5M
|
SB
|
335311
|
John Day
|
John Day Exciter Replacement 16 Units
|
Q1 23
|
|
TBD
|
335311
|
The Dalles
|
The Dalles Exciter Control 22 Units
|
Q1 23
|
|
TBD
|
332312
|
Foster
|
Foster Turbine & Gen Rehab
|
Q2 22
|
|
Unrestricted
|
335311
|
Detroit Dam
|
Transformers (Supply) and Install
|
Q2 22
|
|
TBD
|
332312
|
Detroit Dam
|
Trashrack and Intake Gate
|
Q2 22
|
|
SB
|
333923
|
Green Peter Dam
|
Green Peter Bridge Crane
|
Q4 22
|
|
TBD
|
237990
|
West Coast
|
Hopper Dredging 2020
|
Q2 22
|
$10M to $25M
|
Unrestricted
|
237990
|
Depoe Bay
|
Catch Basin Maintenance Dredging 2020
|
Q2 22
|
$100K-$500K
|
SB
|
237990
|
SW WA
|
Skipanon Dredging FY22
|
Q2 22
|
$100K-$500K
|
TBD
|
237990
|
OR/WA
|
Coast/River Clamshell Dredging
|
Q2 22
|
$1M to $5M
|
TBD
|
237990
|
Rogue Project
|
Rogue River Maintenance Dredging
|
Q3 22
|
$100K-$500K
|
Unrestricted
|
237220
|
Portland, OR
|
VA Hospital
|
Q2 22
|
$10M to $25M
|
TBD
|
237990
|
Portland, OR
|
MCR Sand Island Pile Dikes Repairs
|
Q4 22
|
$25-$50M
|
SB
|
237990
|
Portland, OR
|
Cottonwood Pile Dikes
|
Q4 22
|
$10M to $25M
|
SB
|
237990
|
Portland, OR
|
Willamette Falls Lock Seismic and Safety Upgrade
|
Q4 22
|
$1-5M
|
SB
|
237990
|
SW WA
|
Spirit Lake Outlet Tunnel - Gate Replacement
|
Q2 22
|
$10M to $25M
|
SB
|
237990
|
SW WA
|
Mt St Helens (MSH) Deer Creek Fish release Site
|
Q4 22
|
$1-5M
|
SB
|
237990
|
SW WA
|
Sediment Ret Structure Spillway Crest Raise
|
Q4 22
|
$10M to $25M
|
SB
|
237990
|
Bonneville
|
Bonneville 1 Spillway Rock Removal
|
Q2 22
|
$500K-$1M
|
SB
|
237990
|
Bonneville
|
Power Plant 1 Headgate Repair Pit Rehabilitation
|
Q2 22
|
$1-5M
|
SB
|
237990
|
Bonneville
|
Power Plant 1 Preferred AC/DC Improvement
|
Q2 22
|
$5-10M
|
SB
|
238220
|
Bonneville
|
Power Plant 1 Digital Governors
|
Q2 22
|
$5-10M
|
Unrestricted
|
237990
|
Bonneville
|
Ice + Trash Sluiceway Gate
|
Q3 22
|
$1-5M
|
SB
|
237990
|
Bonneville
|
Generator Coolers (supply follow-on)
|
Q3 22
|
$500K-$1M
|
Unrestricted
|
238210
|
Bonneville
|
Bradford Is Serv Bldg PRQ Switchgear Upgrade
|
Q1 23
|
$1-5M
|
SB
|
238210
|
Bonneville
|
Bonneville 1 MUB Replacement (Supply)
|
Q1 23
|
|
Unrestricted
|
237990
|
Bonneville
|
Spillway Gate Repair & Storage Pits
|
Q3 23
|
$5-$10M
|
SB
|
237990
|
Bonneville
|
Stoplogs
|
Q3 23
|
$1-5M
|
SB
|
237990
|
John Day
|
Control Room Fire Protect
|
Q2 22
|
$5M to $10M
|
SB
|
238220
|
John Day
|
Power Plant HVAC Upgrades
|
Q2 22
|
$5-$10M
|
SB
|
237990
|
John Day
|
Turbine Replacement and Generator Rewind
|
Q1 23
|
Over $500M
|
Unrestricted
|
561621
|
John Day
|
Powerhouse Security System Upgrades
|
Q4 22
|
$1-5M
|
SB
|
237990
|
John Day
|
Turbine Pit Pumps Reliability Improvements
|
Q4 22
|
$1-5M
|
SB
|
237990
|
John Day
|
Nav Lock Gate Bearing Shoe Repair
|
Q4 23
|
$1-5M
|
SB
|
332410
|
John Day
|
Generator Cooling Water System
|
Q3 23
|
$500K-$1M
|
Unrestricted
|
238210
|
The Dalles
|
Control Room Modernization
|
Q3 23
|
TBD
|
TBD
|
237990
|
The Dalles
|
Navlock Tainter Valve
|
Q4 23
|
$1-5M
|
SB
|
237990
|
The Dalles
|
Oil Accountability (supply and install)
|
Q3 23
|
$1-5M
|
SB
|
237990
|
Blue River
|
Blue River Slope Repair
|
Q4 22
|
$500K-$1M
|
SB
|
541715
|
Lebanon, OR
|
Lebanon Dam Fish Counters
|
Q3 22
|
$100K-$500K
|
Unrestricted
|
237990
|
Detroit Dam
|
Transformer Install
|
Q2 22
|
$1-5M
|
SB
|
238220
|
Cougar Dam
|
Main Unit Breakers & Electrical Reliability Upgrades
|
Q3 22
|
$1-5M
|
Unrestricted
|
237990
|
Foster Dam
|
Powerhouse and Transformer Oil Water Separator
|
Q2 22
|
$1-5M
|
SB
|
237990
|
Foster Dam
|
Foster Turbine & Gen Rehab
|
Q1 23
|
$1-5M
|
Unrestricted
|
238220
|
Green Peter
|
Main Unit Breakers & Electrical Reliability Upgrades
|
Q2 22
|
$10-25M
|
Unrestricted
|
238220
|
Oakridge, OR
|
Look Out Point Unit 2 Bus
|
Q1 22
|
$500K-$1M
|
SB
|
238220
|
Hills Creek Dam
|
Main Unit Breakers & Electrical Reliability Upgrades
|
Q2 22
|
$1-5M
|
Unrestricted
|
237990
|
Hills Creek Dam
|
Hills Creek Rock Removal and Reinforcement
|
Q3 22
|
$1-5M
|
SB
|