WALLA WALLA DISTRICT:
|
Anticipated
NAICS
|
Project
Location
|
Project Title
|
Fiscal
Year
|
Estimated
Dollar Value
|
Acquisition Plan
(Set Aside)
|
236210
|
Clarkston, WA
|
LLA Clarkston NRM Office Replacement
|
Q1 21
|
TBD
|
TBD
|
236210
|
Lucky Peak Dam
Ada Co., ID
|
Office Building
|
Q4 22
|
TBD
|
TBD
|
237990
|
Ice Harbor Dam Burbank, WA
Lower Granite Dam Garfield Co., WA
|
(Project on Hold)
HLD LLA Channel Maintenance
|
Q4 21
|
TBD
|
TBD
|
237990
|
McNary Dam
Umatilla Co., OR
|
Cranes 4 and 5 Replacement
|
Q4 21
|
$10M to $25M
|
TBD
|
237990
|
Northwestern Division
|
Generator Repair - MATOC
|
Q4 21
|
TBD
|
TBD
|
237990
|
Ice Harbor Dam
Burbank, WA
|
Intake Gate Hydraulic System Upgrades
|
Q4 22
|
$5M to $10M
|
TBD
|
237990
|
McNary Dam
Umatilla Co., OR
|
Powerhouse Drainage, Unwatering Upgrade
|
Q4 22
|
$10M to $25M
|
TBD
|
237990
|
Dworshak Dam
Ahsahka, ID
|
Spillway Gate Repairs
|
Q4 23
|
$1M to $5M
|
TBD
|
237990
|
Kennewick, WA
|
Clover Island Environmental Restoration Contract
|
Q1 21
|
$1M to $5M
|
TBD
|
237990
|
McNary Dam, Umatilla Co., OR
Lower Monumental Dam, Kahlotus, WA
Little Goose Dam, Dayton, WA
|
McNary Headgate Repair Pit Upgrade
Lower Monumental Headgate Repair Pit
Little Goose Headgate Repair Pit Upgrades
|
Q1 21
|
$5M to $10M
|
OTSB
|
237990
|
McNary Dam
Umatilla Co., OR
|
Levee Drainage Pump Station Upgrades
|
Q1 22
|
$10M to $25M
|
TBD
|
237990
|
Lower Granite Dam
Garfield Co., WA
|
Levee System Drainage Lines Repairs (Lindsay Creek & 380 Drainage Lines)
|
Q1 22
|
$1M to $5M
|
SB
|
237990
|
Dworshak Dam
Ahsahka, ID
|
Life Safety Fire Alarm System Upgrade
|
Q1 22
|
TBD
|
TBD
|
237990
|
Lower Granite Dam
Garfield Co., WA
|
Life Safety Fire Alarm System Upgrade
|
Q1 23
|
TBD
|
TBD
|
237990
|
Lower Monumental Dam Kahlotus, WA
|
Life Safety Fire Alarm System Upgrade
|
Q1 23
|
TBD
|
TBD
|
237990
|
Lower Monumental Dam Kahlotus, WA
|
Unit 2 Hub Seal Repairs
|
Q2 21
|
$250K to $500K
|
TBD
|
237990
|
Little Goose Dam, Dayton, WA
Lower Granite Dam, Garfield Co. WA
Lower Monumental Dam, Kahlotus, WA
|
LGA Trashrack Crane and Rake Repair
LLA Trashrack Crane & Rack Upgrade
LMA Trashrack Crane & Rake Upgrade
|
Q2 21
|
$10M to $25M
|
OTSB
|
237990
|
Lower Granite Dam
Garfield Co., WA
|
Unit 2 Blade Sleeve Upgrade
|
Q2 21
|
$1M to $5M
|
TBD
|
237990
|
McNary Dam
Umatilla Co., OR
|
Navigation Lock Derrick Cranes Replacement
|
Q2 21
|
$5M to $10M
|
TBD
|
237990
|
Lower Monumental Dam Kahlotus, WA
|
Floating guidewall Cable Replacement
(Stimulus Pending)
|
Q2 21
|
$1M to $5M
|
TBD
|
237990
|
Little Goose Dam
Dayton, WA
|
Floating guidewall Cable Replacement
(Stimulus Pending)
|
Q2 21
|
$1M to $5M
|
TBD
|
237990
|
Ice Harbor Dam
Burbank, WA
|
Life Safety Fire Alarm System Upgrade
|
Q2 22
|
TBD
|
TBD
|
237990
|
Lower Granite Dam
Garfield Co., WA
|
MU 3-6 Turbine Blade Seal Replacement
|
Q2 22
|
NA
|
TBD
|
237990
|
McNary Dam
Umatilla Co., OR
|
Waste Water Upgrade - Connect to City of Umatilla
|
Q3 21
|
$1M to $5M
|
SB
|
237990
|
McNary Dam
Umatilla Co., OR
|
Spillway Gate & Hoist Upgrade
|
Q3 21
|
$10M to $25M
|
TBD
|
237990
|
Lower Monumental Dam Kahlotus, WA
|
Main Unit 4 Scroll Case Repair
|
Q3 21
|
$500K to $1M
|
SB
|
237990
|
Dworshak Dam
Ahsahka, ID
|
Steelhead Smolt Release Pipe Repairs
|
Q3 22
|
$1M to $5M
|
TBD
|
237990
|
Little Goose Dam
Dayton, WA
|
Life Safety Fire Alarm System Upgrade
|
Q3 22
|
TBD
|
TBD
|
237990
|
Ice Harbor Dam
Burbank, WA
|
Transformer Deluge Fire Protection System Upgrade
|
Q3 26
|
TBD
|
TBD
|
237990
|
Walla Walla, WA
|
Design-Build MATOC
|
Q4 21
|
TBD
|
SB
|
237990
|
McNary Dam
Umatilla Co., OR
|
Headgate System Rehabilitation
|
Q4 21
|
$25M to $100M
|
SB
|
237990
|
McNary Dam
Umatilla Co., OR
|
Station Service Turbine Repairs
|
Q4 21
|
$5M to $10M
|
OTSB
|
237990
|
Mill Creek
Walla Walla, WA
|
Diversion Dam Fish Ladder
|
Q4 21
|
TBD
|
SB
|
237990
|
Mill Creek
Walla Walla, WA
|
Diversion Dam Low Flow Radial Arm Gate Repair
|
Q4 21
|
$250K to $500K
|
SB
|
237990
|
Lower Granite Dam
Garfield Co., WA
|
Primary Dewatering System Slope Stability
|
Q4 21
|
TBD
|
TBD
|
237990
|
Ice Harbor Dam
Burbank, WA
|
Replace Fish Ladder Weir Gates / Hoists
|
Q4 22
|
$1M to $5M
|
TBD
|
237990
|
Little Goose Dam, Dayton, WA
Lower Granite Dam, Garfield Co. WA
Lower Monumental Dam, Kahlotus, WA
|
LGA Tainter Valves System Upgrade (Navigation Lock)
LLA Tainter Valves System Upgrade (Navigation Lock)
LMA Navigation Lock Tainter Valves
|
Q4 22
|
$10M to $25M
|
TBD
|
237990
|
Lower Monumental Dam Kahlotus, WA
|
Tailrace Stop Logs
|
Q4 22
|
TBD
|
TBD
|
237990
|
McNary Dam
Umatilla Co., OR
|
Life Safety Fire Alarm System Upgrade
|
Q4 24
|
TBD
|
TBD
|
237990
|
Ice Harbor Dam
Burbank, WA
|
Navigation Lock Upstream Gate Repair
|
Q4 25
|
$5M to $10M
|
TBD
|
237990
|
McNary Dam
Umatilla Co., OR
|
Navigation Lock Downstream Gate Replacement (Fabrication)
|
Q4 26
|
$25M to $100M
|
TBD
|
237990
|
Little Goose Dam
Dayton, WA
|
North Shore Fish Ladder Jetty Repair
|
Q4 30
|
TBD
|
TBD
|
237990
|
Dworshak Dam
Ahsahka, ID
|
Intake Gantry Crane Replacement
|
Q4 40
|
TBD
|
TBD
|
237990
|
McNary Dam
Umatilla Co., OR
|
Fish Pumps Rehabilitation
|
TBD
|
$25M to $100M
|
TBD
|
238160
|
Little Goose Dam
Dayton, WA
|
Powerhouse Roof Replacement
|
Q2 21
|
$1M to $5M
|
TBD
|
238210
|
Lower Monumental Dam Kahlotus, WA
|
Navigation Lock Electrical Power System & Controls Replacement
|
Q4 22
|
$5M to $10M
|
TBD
|
238210
|
Little Goose Dam
Dayton, WA
|
DC System & Low Voltage Switchgear Upgrade (Replacement)
|
Q1 23
|
$10M to $25M
|
TBD
|
238210
|
McNary Dam
Umatilla Co., OR
|
GSU T1 - T7 Transformer Leak Repair
|
Q2 21
|
TBD
|
TBD
|
238210
|
Lower Monumental Dam Kahlotus, WA
|
DC System & Low Voltage Switchgear Upgrade (Replacement)
|
Q3 21
|
$10M to $25M
|
TBD
|
238210
|
McNary Dam
Umatilla Co., OR
|
Navigation Lock Electrical Power System & Controls Upgrade
|
Q3 22
|
$10M to $25M
|
TBD
|
238210
|
McNary Dam
Umatilla Co., OR
|
Isophase, HV Bus and Switch Upgrades
|
Q4 21
|
$25M to $100M
|
TBD
|
238210
|
Little Goose Dam
Dayton, WA
|
Powerhouse Annuciation and Controls
|
Q4 22
|
$1M to $5M
|
TBD
|
238220
|
Dworshak Dam
Ahsahka, ID
|
Mech Building 1 Boiler/Heat Exchanger Replacement
|
Q4 28
|
$1M to $5M
|
TBD
|
238290
|
Northwestern Division
|
Crane Design, Repair, Fabrication, Construction - MATOC
|
Q4 21
|
TBD
|
TBD
|
238290
|
Lower Monumental Dam Kahlotus, WA
|
Powerhouse Bridge Crane Drive Upgrade
|
Q2 22
|
$1M to $5M
|
TBD
|
332312
|
McNary Dam
Umatilla Co., OR
|
Trashracks Rehabilitation (Supply)
|
Q2 21
|
NA
|
SB
|
332312
|
Lower Granite Dam, Garfield Co., WA
Lower Monumental Dam, Kahlotus, WA
|
Lower Granite & Lower Mounumental Turbine Maintenance Platforms
|
Q3 21
|
NA
|
SB
|
333312
|
Northwestern Division
|
Metal Fabrication - Hydraulic Steel Structures - MATOC (Supply)
|
Q2 21
|
NA
|
TBD
|
333911
|
Lower Monumental Dam Kahlotus, WA
|
Transformer T2 Bushing and Leak Repair
(Service Contract)
|
Q2 21
|
NA
|
TBD
|
333912
|
Lower Monumental Dam Kahlotus, WA
|
Station Service Compressed Air System Upgrade (Supply)
|
Q2 21
|
NA
|
SB
|
335312
|
Little Goose Dam
Dayton, WA
|
North Shore Emergency Generator (Supply)
|
Q1 21
|
TBD
|
TBD
|
541330
|
Walla Walla, WA
|
A&E Multi Discipline - Unrestricted
|
Q3 22
|
NA
|
OTSB
|
541330
|
Walla Walla, WA
|
A&E Structural and Mechanical
|
Q3 22
|
NA
|
OTSB
|
541330
|
Walla Walla, WA
|
A&E Geological & Geotechnical
|
Q3 22
|
NA
|
OTSB
|
541330
|
Walla Walla, WA
|
A&E Cost Engineering - Unrestricted
|
Q3 22
|
NA
|
OTSB
|
541330
|
Walla Walla, WA
|
A&E Cost Engineering - Small Business Set Aside
|
Q3 22
|
NA
|
SB
|
541330
|
Walla Walla, WA
|
A&E Multi Discipline - Small Business Set Aside
|
Q3 22
|
NA
|
SB
|
541330
|
Walla Walla, WA
|
A&E Cost Engineering - FCL
|
Q4 22
|
NA
|
OTSB
|
541370
|
Walla Walla, WA
|
A&E Hydrographic Survey
|
Q2 21
|
NA
|
OTSB
|
541370
|
Walla Walla, WA
|
A&E Survey & Mapping
|
Q3 24
|
NA
|
OTSB
|
541620
|
Walla Walla, WA
|
Environmental Consulting
|
Q3 22
|
NA
|
8(a)
|
561990
|
Walla Walla & Portland Districts
|
NWW - Dive Services (SATOC)
|
Q3 21
|
NA
|
SB
|
811211
|
Ice Harbor Dam
Burbank, WA
|
Exciter Control Upgrade (Service)
|
Q1 22
|
NA
|
TBD
|
811310
|
Northwestern Division
|
NWD Generator and Turbine Bearings IDIQ (Supply)
|
Q1 21
|
NA
|
SB
|
237990
|
Ice Harbor Dam
Burbank, WA
|
SMCJ Relocate Spillway Power Generator & Seismic Bracing
|
Q2 21
|
$25K to $100K
|
SB
|
238210
237990
|
McNary Dam
Umatilla Co., OR
|
Digital Governor Upgrade
Exciters Upgrade
Powerhouse Controls Upgrade
Governor Mechanical System Rehab
|
Q2 21
|
$25M to $100M
|
OTSB
|