Portland District -- Provides engineering services to the Pacific Northwest and Nation to strengthen our security, promote a strong economy & enhance environmental sustainability. The District encompasses nearly 97,000 square miles of land and water in Oregon and southwestern Washington. The District’s future is tied to helping to balance the region’s competing needs for navigation, flood damage reduction, hydropower, fish and wildlife habitat, disaster recovery, irrigation and recreation. This is accomplished by improving and maintaining navigation for economic development and safety, preventing & reducing flood damage, restoring, enhancing & maintaining ecosystems, generating reliable and efficient hydropower, regulating activities in wetlands and waterways, providing Corps-wide expertise in hydroelectric planning and engineering, and by providing safe and healthful recreational opportunities for the public.
Web: https://www.nwp.usace.army.mil/business-with-us/
|
Anticipated NAICS
|
Project Location
|
Project Title
|
Advertise Date
|
Estimated Dollar/Ceiling
|
Set Aside
|
Strategy
|
|
237990
|
SW WA
|
Mt St Helens Fish Collection Facility
|
Q1 27
|
$25M - $100M
|
F&O
|
|
|
237990
|
OR/WA/CA
|
West Coast Hopper Dredging
|
Q2 26
|
$25M - $100M
|
F&O
|
DBB, IFB
|
|
336611
|
TBD
|
Essayons Maintenance & Repair Contract
|
Q3 26
|
$10M-$25M
|
F&O
|
Svs, IFB
|
|
336611
|
TBD
|
Yaquina Maintenance & Repair Contract
|
Q3 26
|
$5M-$10M
|
F&O
|
Svs, IFB
|
|
237990
|
Northwestern Division
|
Portland District Design-Build & Design-Bid-Build IDIQ
|
Q4 26
|
TBD
|
TBD
|
BVTO
|
|
237990
|
OR/SW WA
|
Skamokawa Pile Dikes
|
Q1 27
|
$10M-$25M
|
TBD
|
DBB, IFB
|
|
237990
|
OR/SW WA
|
Cottonwood Pile Dikes
|
Q3 26
|
$10M-$25M
|
SB
|
DBB, IFB
|
|
237990
|
OR/SW WA
|
Miller Rice Pile Dikes
|
Q3 26
|
$25M-$50M
|
F&O
|
DBB, IFB
|
|
238210
|
The Dalles, OR
|
Transformer 9-11 Interim Repair
|
Q2 26
|
$1M-$5M
|
TBD
|
|
|
237990
|
The Dalles, OR
|
South, North + East Fish Ladder
|
Q2 27
|
TBD
|
SB
|
|
|
237990
|
The Dalles, OR
|
Oil Accountability
|
Q1 26
|
$1M-$5M
|
F&O
|
|
|
237990
|
The Dalles, OR
|
Nav Lock Tainter Valve
|
Q1 27
|
$1M-$5M
|
SB
|
|
|
237990
|
John Day, OR
|
John Day Fish Pump Rehabilitation
|
Q2 26
|
$1M-$5M
|
SB
|
IFB
|
|
561621
|
John Day, OR
|
JD Powerhouse Security System Upgrades
|
Q2 27
|
$5M-$10M
|
SB
|
|
|
238220
|
John Day, OR
|
HVAC Upgrades
|
Q3 26
|
$25-$100M
|
F&O
|
DBB, IFB
|
|
238210
|
John Day, OR
|
Turbine Rehab Generator Rewind (TRGR)
|
Q4 28
|
>$500M
|
F&O
|
DB, BVTO
|
|
237990
|
John Day, OR
|
Transportation and Site Access
|
Q2 26
|
$10M-$25M
|
TBD
|
DB, BVTO
|
|
237990
|
John Day, OR
|
Storage Building
|
Q4 26
|
$5M-$10M
|
TBD
|
|
|
332312
|
Willamette Valley, OR
|
Big Cliff Dam Trashrack
|
Q3 27
|
$10M-$25M
|
SB
|
|
|
532490
|
Lane Co.
|
Lookout Point Deep Draw Down Mitigation Measure
|
Q2 26
|
$500K-$1M
|
F&O
|
|
|
237990
|
Newport, OR
|
Port of Newport Nav Improvements Sec 107
|
Q1 27
|
TBD
|
TBD
|
|
|
237990
|
Cascade Locks, OR
|
BON PH1 Trashrack Replacement
|
Q3 26
|
$25M - $100M
|
TBD
|
|
|
237990
|
The Dalles, OR
|
Hammerhead Crane Repair
|
Q2 26
|
$1M-$5M
|
TBD
|
DBB
|
|
333923
|
John Day, OR
|
Nav Lock Wire Ropes (Supply Only)
|
Q3 26
|
|
TBD
|
Sup
|
|
237990
|
Multnomah Co.
|
Portland Metro Levee System Stations 5-11
|
Q2 27
|
TBD
|
TBD
|
|
|
541370
|
OR/WA
|
A-E Topography and Photogrammetry Surveying IDIQ
|
Q3 26
|
$6M
|
SB
|
|
|
237990
|
The Dalles, OR
|
Tailrace Crane Rail Replacement
|
Q3 26
|
$5M-$10M
|
SB
|
DBB,IFB
|
|
TBD
|
The Dalles, OR
|
Gate Repair Pit Follow On
|
TBD
|
TBD
|
TBD
|
DBB,IFB
|
|
|
World Wide
|
BPA Overseas QA Inspections
|
Q3 26
|
$500K
|
F&O
|
Svs
|
|
|
John Day, OR
|
JD Unit 8 Asbestos Abatement
|
Q4 26
|
$500k - $1M
|
TBD
|
|
|
237990
|
John Day, OR
|
John Day Headcover 10 repair
|
Q4 26
|
$800K - $1M
|
TBD
|
IFB
|
Key:
Svs: Services
Sup: Supply
BVTO: Best Value Tradeoff
IFB: Invitation for Bid
DBB: Design-Bid-Build
DB: Design-Build
SAP: Simplified Acquisition Procedures