US Army Corps of Engineers
Northwestern Division Website

News Releases

Results:
Archive: July, 2018
Clear
  • Releases from Garrison Dam continue to decline, project crews to test recent repairs

    Releases from Garrison Dam have been reduced to a rate of 54,000 cfs and will drop to 50,000 cfs this Thursday. After a month at 60,000 cfs, releases were reduced to 57,000 cfs on July 24. The gage at Bismarck peaked at a stage of 13.4 feet on June 29, which is approximately 1 foot below flood stage. Rapid mountain snowmelt in June coupled with heavy rains in Montana and northern Wyoming, would have caused much higher stages in Bismarck without Garrison Dam capturing that runoff. Instead of a peak of 13.4 feet on June 29, the river rise would have begun in late March hovering above flood stage through late June with a peak stage of 19.2 feet.
  • Northwestern Division welcomes new commander

    At an assumption of command ceremony today, Brig. Gen. D. Peter Helmlinger assumed command of the Northwestern Division office of the U.S. Army Corps of Engineers. He succeeds Col. Torrey A. DiCiro who assumed command of the division following the reassignment of Maj. Gen. Scott A. Spellmon to the Corps’ headquarters in May.
  • Higher-than-average releases from Missouri River Mainstem projects to continue

    Due to the water currently being stored in the reservoirs and the higher-than-average runoff being forecast in the Missouri River Basin above Sioux City, Iowa, the service level was increased 25,000 cubic feet per second (cfs) above full service in late June to facilitate the evacuation of stored flood waters. The increased service level means that Gavins Point releases will be increased to approximately 60,000 cfs, as downstream tributary flows recede.
  • U.S. Army Corps of Engineers Identifies Long-Term Disaster Recovery Projects and Additional Short-Term Repairs to be Accomplished with 2018 Supplemental Funding

    The U.S. Army Corps of Engineers (USACE) announced today additional work that it plans to accomplish with the funding provided for disaster recovery in Public Law 115-123, the Bipartisan Budget Act of 2018, signed into law February 9, 2018.