US Army Corps of Engineers
Northwestern Division

Spillway at Fort Peck Dam_
On July 15, 2018, releases from Fort Peck Dam were 17,000 cfs with a portion of those releases passing through the spillway during scheduled maintenance at the Fort Peck powerhouse._

Download Image: Full Size (1.82 MB)
Photo by: Eileen Williamson |  VIRIN: 180715-A-RO090-201.JPG